August 13, 2026
Last Thursday night, August 6, the Raleigh Design Review Commission sat through nearly five hours of testimony on a single building and adjourned without a vote. If you only caught the headline, you'd think North Hills was locked in a fight over whether a 15-story tower gets built at the corner of Lassiter Mill Road and The Circle at North Hills Street. It isn't. That question was closed out back in January.
What's still open is narrower, and stranger, than most coverage has made it sound: a debate over how many windows a building needs, how far it has to sit back from the curb, and where its loading dock goes. Understanding that difference matters if you live anywhere near North Hills, because it tells you which parts of this summer's construction noise are negotiable and which parts are already baked in.
Kane Realty and McCourt Partners spent the first half of this year laying out their vision for a 28-acre expansion of North Hills, land the company acquired in January as part of a $72 million purchase between Navaho Drive and Interstate 440. The City of Raleigh approved the rezoning for the specific tower now under debate that same month. The density, the height, the basic footprint of North Hills Expansion Tower II: all of that cleared its major hurdle before most residents were watching closely.
Kane has described its approach as building upward instead of outward, aiming for a district that stays walkable even as it adds height. Whatever you think of that strategy, the zoning entitlements that make a 15-story building legal on that corner are no longer in play. What's left to fight over is design.
The Raleigh Design Review Commission isn't a zoning body. Its job is to check a proposed building against the city's Unified Development Ordinance, the rules that govern how a structure meets the street rather than whether it can exist at all. City rules require street-facing buildings to include a set percentage of glass and windows, and require taller buildings to step back from the sidewalk as they rise. Kane Realty is asking the commission to waive both requirements for Tower II, requesting permission to run solid walls where the ordinance calls for transparency.
Commissioners spent much of that session on the building's first two floors, and specifically on a loading dock planned for the side of the building closest to Lassiter Mill Road. Kane's representatives argued the dock's placement reflects feedback from other North Hills projects and would actually improve pedestrian safety and traffic flow. Commissioners wanted a shade study before deciding anything, and asked for more information rather than voting either way. The earliest the discussion picks back up is September.
Two residents put a face on what's at stake. One North Hills resident has hired legal counsel over the proposal, arguing the tower would block the view from her front door and add shade to the area. As WRAL reported, she said:
"I chose my home because it had a nice view of North Hills. I could see the sky. I didn't sign up for this. I thought this was going to be my retirement home."
Another resident, Larry Helfant, told the commission the building's design doesn't comply with the ordinance as written and argued the vote should have happened that same night rather than being delayed. Traffic and infrastructure worries along Six Forks Road have been a recurring theme in North Hills' growth for years now, and this meeting was just the latest version of that argument, this time focused on glass instead of gridlock.
None of this changes whether Tower II gets built. It changes how it looks and how it handles the sidewalk, which is a real thing to care about if you walk that corner daily, but it's a different fight than the headlines suggest.
While that argument plays out in commission chambers, a completely separate track of the same 28-acre expansion has been opening for business all summer, with no public design hearing required.
Standard Beer + Food opened its new North Hills location on July 14, more than two years after it was first announced for the district. The original Person Street location built its reputation on smashburgers and a backyard patio good enough to land it on The News & Observer's Top 50 Triangle restaurants list. The new North Hills building is a different scale entirely: a standalone, all-black structure with more than 5,600 square feet of interior dining and roughly 15,000 square feet of outdoor space, the largest patio in North Hills. Co-owner Cov DeRamus said the new kitchen finally lets Standard do the larger-plate menu the original space never had room for, adding a raw bar with oysters, tartare and ceviche alongside the smashburgers. It's also full-service now rather than the QR-code ordering system regulars know from Person Street.
Benchwarmers Bagels, known for wood-fired bagels and sandwiches, has been building out space nearby, and InTown Golf Club is preparing a 13,000-square-foot venue with eight Trackman-equipped simulator bays, a cocktail lounge, an outdoor patio and locker rooms. It will be the brand's second North Carolina location after Charlotte. Kane Realty has said every retail tenant announced in the Innovation District so far has been a locally based business, which is worth knowing if you've assumed a project this size would default to national chains.
Here's the split in plain terms:
| What's Happening | Approval Path | Status as of August 2026 |
|---|---|---|
| North Hills Tower II (15-story mixed-use) | Design Review Commission, requesting waivers on transparency and setback | Paused August 6, earliest return is September |
| Standard Beer + Food, North Hills Innovation District | Tenant build-out under existing entitlements | Open since July 14 |
| Benchwarmers Bagels | Tenant build-out | Opening within the district this year |
| InTown Golf Club | Tenant build-out | Opening within the district this year |
The tower needs a public hearing because it's asking for exceptions to the rulebook. The restaurants and retail don't, because they're filling space inside a plan the city already approved. That's why you can walk into a full-service raw bar on St. Albans Drive this week while a 15-story building two blocks away sits in procedural limbo until fall.
If you live near The Circle at North Hills Street, the practical takeaway is this: the food and retail side of the expansion is going to keep arriving on its own schedule regardless of what happens with Tower II. You don't need to track a design commission calendar to know when Benchwarmers opens or when InTown Golf starts taking simulator bookings.
The tower is a different clock. September is the earliest the commission revisits it, and given that last Thursday's meeting ran five hours without a resolution, there's no guarantee that date holds either. If shade studies and facade percentages are the kind of thing that affects your daily walk to the corner, that's a meeting worth following. If you're mainly wondering when you can get a table at the new Standard, that answer's already here.
Either way, North Hills is proving something about how growth actually happens in this part of Raleigh: the exciting part, the density and the height, gets decided quietly in a rezoning vote most residents never attend. The part that generates headlines and five-hour meetings is usually about windows.
We track these shifts because North Hills, Cary, Apex, Holly Springs and the rest of the Triangle are the neighborhoods we work in every day, not just markets we write about. If you want more of this kind of on-the-ground read on what's actually changing around you, follow along with Van Starling II.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.
Stay up to date on the latest real estate trends.
If you're looking to sell your home or relocate to or from the Triangle area, reach out to Van via call, text, or message, and he will guide you toward achieving your goals.